Qimam Assarat Company seeks premises in Abha
Deadline: 10/09/2026
Building specifications
| Item | Quantity | Specifications | Item | Quantity | Specifications |
|---|---|---|---|---|---|
| Area | 1 | The area must be at least 800 m² and no more than 1,500 m² | Electricity supply | - | Required |
| Toilets | 8 | Including washbasins | Water supply | - | Required |
| Covered parking spaces | 5 | Must be inside the building boundary wall | Telecommunications lines | - | Required |
| External parking spaces | 15 | Guard room at the external boundary wall | - | Required | |
| Property age | - | Not specified |
Terms
- The property must be owned under a legally valid title deed.
- The property must not be subject to any current or previous legal dispute.
- Air-condition the rooms, halls and annexes; install marble, ceramic or porcelain flooring and suitable window blinds.
- Provide evidence that the building has an STC telephone distribution point (DP), or provide the building coordinates.
- Provide covered parking inside the boundary wall, a guard room and toilet outside the building but within the boundary, and adjacent parking for employees and visitors.
- A building on main streets that is easy to locate is preferred.
- The building must not previously have been vacated by a government agency at the owner's request.
- Undertake any additions or alterations required during the first year of the contract.
- The property owner must not be an employee of the Ministry of Municipalities and Housing.
- Maintain electrical and hydraulic elevators throughout the contract through a specialist company at the owner's expense.
- Provide the required security and safety measures in accordance with Civil Defense and the General Administration of Security and Safety requirements, including a standby power generator and an FM system. Attach a recent Civil Defense certificate.
- Make the alterations and provide the facilities required to adapt the building to the agency's needs, in accordance with the ministry's approved specifications and plans.
- The owner must carry out corrective maintenance and fulfill all building maintenance responsibilities throughout the contract.
- Attach building and architectural plans showing the building area, room layout and areas, and toilets.
- The building must have a landline telephone connection and fiber service from a licensed provider.
- The building must have electricity and water.
- Both parties must comply with the law governing government leasing and vacating of real estate, its implementing regulations and the standard contract.
- Submit applications within fifteen days of the announcement date, including:
- a - A request from the owner stating the rent and full address.
- b - A location sketch of the property.
- c - A copy of the title deed.
- e - A copy of the owner's national identity card.
- Each applicant must sign an acknowledgment of compliance with all terms and requirements through the company's official website.